RHCU Deep Residue Recovery Unit
Project:RHCU Deep Residue Recovery Facility
Customer: Petrofac LLC
Project location: Mažeikiai, Lithuania
Project Duration: 2023-2026
Project Parameters:
- Installation of metal structures (~2500 tonnes)
- Installation of equipment (~800 tonnes)
- Installation of pipelines (~70,000 “weldo inches”)
- Installation of the flare system (pipelines, metal structures, flares)
- Installation of the electrical part
- Installation of automation and control part equipment
- Start-up adjustment work
Work carried out:
- Installation of the electrical and automation part, commissioning debugging works;
- Manufacture of supports;
- Installation of metal structures;
- Installation of equipment.
- Installation of pipelines