RHCU Deep Residue Recovery Unit

Project:RHCU Deep Residue Recovery Facility

Customer: Petrofac LLC

Project location: Mažeikiai, Lithuania

Project Duration: 2023-2026

Project Parameters:

  • Installation of metal structures (~2500 tonnes)
  • Installation of equipment (~800 tonnes)
  • Installation of pipelines (~70,000 “weldo inches”)
  • Installation of the flare system (pipelines, metal structures, flares)
  • Installation of the electrical part
  • Installation of automation and control part equipment
  • Start-up adjustment work

Work carried out:

  • Installation of the electrical and automation part, commissioning debugging works;
  • Manufacture of supports;
  • Installation of metal structures;
  • Installation of equipment.
  • Installation of pipelines