Formalin aggregate
Project: Formalin aggregate
Customer: AB “Achema”
Project location: Jonava, Lithuania
Project implementation: 2016-2018
Projekto parametrai:
- Formalin (37% concentration) production efficiency 100 thousand. t / year
- Reconstruction of 1,800 m3 formalin warehouse
- Installation of a 1,000 m3 formaldehyde resin warehouse
Completed jobs:
- Preparation of technical design;
- Preparation of work project;
- Project execution supervision;
- Manufacture, installation and commissioning of technological equipment;
- Production and installation of metal structures (about 300 tons);
- Installation and commissioning of electrical installations;