Formalin aggregate

Project: Formalin aggregate
Customer: AB “Achema”
Project location: Jonava, Lithuania
Project implementation: 2016-2018

 

Projekto parametrai:

 

  • Formalin (37% concentration) production efficiency 100 thousand. t / year
  • Reconstruction of 1,800 m3 formalin warehouse
  • Installation of a 1,000 m3 formaldehyde resin warehouse

 

Completed jobs:

 

  • Preparation of technical design;
  • Preparation of work project;
  • Project execution supervision;
  • Manufacture, installation and commissioning of technological equipment;
  • Production and installation of metal structures (about 300 tons);
  • Installation and commissioning of electrical installations;